The rail fastening systems that we manufacture as Gürmak Demiryolu are inspected and approved by accredited and independent organizations.
After these homologation and approval processes that require long processes, we have been supplying our products for main manufacturers and important projects for years. We are developing new products by keeping up with the changing technology over the years. Our company, which has an innovative and dynamic structure, provides both quality and economic solutions.
Our products are designed as a system by us and consist of metal, plastic and elastic components. These parts, which are produced in our own facilities, are offered to customers as a system for being tested separately.
EN13481-2 |
EN13481-2 |
EN13481-5 |
EN13481-5 |
TUM W14 Rail Fastening System Report |
TUM GRM AY 1 Rail Fastening System Report |
TUW TPS08 Rail Fastening System Report |
TUM TPS01 Rail Fastening System Report |
EN13481-5 |
DBS918127:2010 – EN13146 |
DBS918127:2010 – EN13146 | |
TUM TPS05 Rail Fastening System Report |
TUM SKL14 Tension Clamp Report |
TUM SKL12 Tension Clamp Report |